Image Popup



Image Popup



Image Popup



Image Popup



Image Popup



Image Popup

Fire Fighting Loop Replacement Unit U-104 Gas Plant

Fire fighting GRE Replacement, Dig Achieved turn key project as piping & valves materials supply, exacavation

  • Client Gulf of Suez Petroleum Company Gupco
  • Pipe Systems Key Lock Pipes & Taper Fittings 20 bar underground system
  • Size Range 2" Up to 24"
  • Conditions Operating Pressure 10 Bar, Operating Temperature 25C
  • Installation Date 2010-2011






Image Popup



Image Popup



Image Popup



Image Popup



Image Popup



Image Popup

Oily Water, De-Salter & Feed Pumps

Suco Petroleum Company, Replacement of old corroded carbon steel lines with new GRE materials in; feed pumps area, desalter lines, oil separation units & Suco - Gaysom potable water line

  • Client Suco Petroleum Company
  • Pipe Systems Taper Pipes & Taper Fittings 20 Bar Above Ground Systems
  • Size Range 2" Up to 16"
  • Conditions Operating Pressure 16 Bar, Operating Temperature 25C
  • Installation Date 2010






Image Popup



Image Popup



Image Popup



Image Popup



Image Popup



Image Popup

El Tarek Fire Fighting Extension

In 2005 Khalda Petroleum Company Used GRE material in the fire fighting network for el Tarek Gas Plant in order to avoid the corrosion attack as the sea water is the fluid media, in 2009 Khalda extended the plant & the GRE fire fighting network was extended using fiberglass butterfly valves

  • Client Apache - Khalda Petroleum Company
  • Pipe Systems Key Lock Pipes & Taper Fittings 12 bar underground system
  • Size Range 4" Up to 10"
  • Conditions Operating Pressure 10 Bar, Operating Temperature 25C
  • Installation Date 2009